
Amazon billionaire Jeff Bezos’ Blue Origin space venture has posted more than 50 job openings for its Blue Moon lunar lander program, which is currently under consideration for NASA funding.

Amazon billionaire Jeff Bezos’ Blue Origin space venture has posted more than 50 job openings for its Blue Moon lunar lander program, which is currently under consideration for NASA funding.

Alabama-based Dynetics says it’s leading a team of companies proposing a crew-carrying lunar lander for NASA, in competition with other companies including Blue Origin and Boeing.

Over the course of six decades, NASA has celebrated the selection of its astronauts in groups ranging from the Mercury 7 of 1959 to the Turtles of 2017 — but there’s never been much of a public celebration for their graduation from astronaut training. Until today.
The 11 astronaut candidates selected in 2017, plus two Canadian astronauts who joined them in training, received a grand send-off at Johnson Space Center in Texas from NASA Administrator Jim Bridenstine and other VIPs to mark their eligibility for assignment to future space missions.
NASA raised the graduation ceremony’s public profile in part to build up enthusiasm for this year’s expected debut of U.S.-built commercial space taxis, as well as the drive to land astronauts on the moon by 2024 — a campaign known as Artemis.

For the first time in more than 40 years, NASA has opened up a pristine sample of moon dirt and rocks that was collected during the Apollo missions.
Scientists hope that a close analysis of the material from a 2-foot-long, nearly 2-inch-wide core sample will help astronauts get ready for a new series of Artemis moon missions in the 2020s.
When Apollo’s moonwalkers collected samples of lunar soil and rock, also known as regolith, some of those samples were tucked away at NASA’s Johnson Space Center with the expectation that analytical tools would improve over the course of the decades that followed. The idea was to keep the samples fresh until the proper time.
NASA says that proper time is now.
The first of the stored lunar samples, known as 73002, was pushed out of its container at Johnson Space Center’s Lunar Curation Laboratory on Nov. 5.

WASHINGTON, D.C. — Not everyone has signed on the dotted line to join NASA’s plan to start sending astronauts to the moon in 2024 via an outpost in lunar orbit known as the Gateway, but the world’s leading space agencies are already staking out their roles.
Russia, for example, plans to work on its own space transportation system that would parallel NASA’s Space Launch System rocket and Orion crew capsule. Europe and Japan are planning to provide logistical support for space operations. And Canada will be supplying the Gateway’s robotic arm.
Space agency officials laid out the status of their plans for the final frontier today during a panel discussion and follow-up news briefing at the International Astronautical Congress in Washington.

The fashion statement for NASA’s future moonwalkers goes beyond basic white to add some flag-worthy touches of red and blue.
But the color scheme for the “pumpkin suits” that astronauts wear during launches and landings is relatively unchanged, due to practical considerations. It turns out that the old orange, with a few blue accents added, is the new orange.
Both suit designs had their debut today at NASA Headquarters as part of the buildup to the Artemis moon program, which is due to put the first woman and the next man on the lunar surface by as early as 2024.

After two preliminary rounds, NASA today published its final call for industry proposals to have the first two landers capable of putting astronauts on the moon ready for 2024 and 2025.
NASA’s broad agency announcement, known as NextSTEP-2 Appendix H, makes clear that two different companies would be chosen to build human-capable landers. One of them would be used for the Artemis 3 mission, which aims to send two astronauts to and from the lunar surface in 2024. The other would be used for a demonstration mission in 2025.
Those two missions would set the stage for putting an upgraded lander on the moon in 2026 to demonstrate a “sustainable” approach to lunar exploration. That follow-up demonstration mission would serve as a “precursor to procuring lunar landing services as commercial services beginning in 2028,” NASA said.
And here’s the kicker: The proposals for the first two landers are due in a month.

The latest meeting of the National Space Council provided a forum to build support for NASA’s twin-focus plan to send astronauts to the Moon in preparation for trips to Mars – and for the idea of using nuclear-powered rockets to get there.
In contrast to some of the council’s past meetings, today’s session at the National Air and Space Museum’s Udvar-Hazy Center in Virginia produced no Space Policy Directives with capital letters. Instead, administration officials – led by Vice President Mike Pence – summarily approved a set of recommendations aimed at fostering cooperation with commercial ventures and international partners on NASA’s moon-to-Mars initiative.
Pence said the recommendations give NASA Administrator Jim Bridenstine a 60-day timeline for “designation of an office and submission of a plan for sustainable lunar surface exploration and the development of crewed missions to Mars.”

NASA Administrator Jim Bridenstine announced today that Marshall Space Flight Center in Alabama will take the lead role in developing the vehicles for landing astronauts on the moon – which could be good news for Amazon CEO Jeff Bezos’ Blue Origin space venture, but definitely came as bad news for Texas lawmakers.
To be fair, Texas is getting a piece of the action in NASA’s Artemis moon program as well: NASA’s Johnson Space Center in Houston will continue to take the lead role in human spaceflight – and in the development of the ascent module for the human landing system.
The latest step in NASA’s Artemis plan for sending astronauts to the moon within five years came during a ceremony at Marshall Space Flight Center in Huntsville, Ala., staged in front of a 149-foot-tall structural test model for NASA’s heavy-lift Space Launch System rocket.
Bridenstine said the moon lander program would bring 140 jobs to Marshall and 87 jobs to Johnson, with another 136 distributed among other NASA centers. “We focus on a ‘One NASA’ integrated approach that uses the technical capabilities of many centers,” he said.
Despite Bridenstine’s reassurances, Texan members of Congress said they were disappointed by the decision, and complained that NASA officials hadn’t told them about Alabama’s elevated role until reports started appearing in news outlets such as Ars Technica.

NASA says it’s choosing Northrop Grumman to build the habitation module for its future moon-orbiting Gateway outpost, because it’s the only company that can do the job in time for a 2024 lunar landing.
In a procurement document released last week, the space agency said the other companies that were competing to build the Minimal Habitation Module as part of NASA’s NextSTEP program — Bigelow Aerospace, Boeing, Lockheed Martin, NanoRacks and Sierra Nevada Corp. — couldn’t have their hardware ready in time to meet the deadline set by the Trump administration.
“NGIS [Northrop Grumman Innovation Systems, formerly Orbital ATK] was the only NextSTEP-2 contractor with a module design and the production and tooling resources capable of meeting the 2024 deadline,” NASA said.
For that reason, NASA is going with a sole-source process to award the contract for the habitation module, short-circuiting the full and open NextSTEP-2 Appendix A competition. As long as Northrop Grumman submits an acceptable proposal with a price tag that’s “fair and reasonable,” NASA will give its go-ahead.